Level sensor

SCH-TFL Miniature tuning fork level switch

The tuning fork liquid level switch works by vibrating the tuning fork at a certain resonant frequency through a pair of piezoelectric crystals mounted on the tuning fork base.

♦Level switch based on vibrating short tuning fork technology.

♦Compact switch

♦Features a durable stainless steel body and tuning fork for use in a variety of liquid applications.

♦Installation via threads on pipes or tanks or via hygienic connections in food industry facilities

♦Direct load switching suitable for all power supplies or PNP outputs


SCH-TFL Miniature tuning fork level switch

The tuning fork liquid level switch works by vibrating the tuning fork at a certain resonant frequency through a pair of piezoelectric crystals mounted on the tuning fork base. When the tuning fork of the tuning fork liquid level switch is in contact with the measured medium, the frequency and amplitude of the tuning fork will change. These changes of the tuning fork liquid level switch are measured by the intelligent circuit, processed and converted into a switching signal.

Technical Specification

voltageAC220V/DC24V
power≤1W
Ambient temperatureMeter -30 ° C ~ 100 ° C
Work pressure≤2Mpa
Media specific gravity>0.6g/cm3
Action pointInsert vertically into the water about 25mm
Response timeAbout 1 second
output methodA set of relay outputs (3A/220VAC; 3A/30VDC)
Output delayAdjustable from 1 to 50 seconds
SensitivityAdjustable according to materials, can be set to 10
Operating temperatureFork body -30~150 °C (can accept high temperature custom)
Fork materialSUS304, SUS316, etc.
Connection methodVarious standard threads, flanges, chuc


Product Display

Small Relay Output Tuning Fork Level Switch details

Small Relay Output Tuning Fork Level Switch features

Small Relay Output Tuning Fork Level Switch type

FAQ

Can you produce according to the samples or drawings?

Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.

What is the lead time?

 

For standard models, lead time is about 3~5 days after order confirmed and payment received.

For OEM orders, the delivery is about 2~3 weeks after data confirmed and payment received.

 

How to solve the quality problems after sales?

Take photos or videos of the problems and send to us.

We will make a satisfied solution for you within 24 hours after we confirm the problems.


热门推荐